ROYAL FAR WEST CENTRE, 18-22 WENTWORTH STREET, MANLY

  • Design & Construct Basement Retention
    Design & Construct Basement Retention
  • Secant Piled Wall Construction
    Secant Piled Wall Construction
  • Capping Beam, anchors, walers and braces
    Capping Beam, anchors, walers and braces
Client: 
FDC Building
Works: 
D&C secant piled shoring package
Project Value: 
$1.50M
Completion Date: 
January, 2018

Due to the sensitivity of the project (situated next to a Heritage & government building), ground conditions (loose sand and high water table) and high tension loads, the design had to be reviewed extensively and approved by various external consultants and authorities. The project consist of 266 interlocking secant piles, 133 lm capping beam (up to 1200mm high), anchors, walers & bracings/struts.