BLACKTOWN HOSPITAL ACUTE SERVICES BUILDING

  • Design & Construction of a piled retaining wall
    Design & Construction of a piled retaining wall
  • Design & Construct Foundation Piles
    Design & Construct Foundation Piles
Client: 
Donnelley Constructions & A W Edwards
Works: 
D&C soldier piled wall, foundation piles and tunnel shoring system
Project Value: 
$3.50M
Completion Date: 
January, 2018

A D&C shoring package in which RIX installed 1,400 lm of 600mm dia. piers, 326lm of capping beam, 200no. anchors, 1,900m2 of shotcrete and performed PIT and DPA pile testing. RIX was then engaged by AW Edwards for the foundation works, comprising of 750 lm of 750/900/1200mm foundation piles and later on a shoring system connecting the new build to the Year 2000 building along with shotcreting the excavated tunnel face.